Corrales: Project stage – Discovery

  • The project consists of a zinc oxide manto within favorable laminated limestone traced over 600 m along strike and is exposed over widths ranging from 2 m to 16 m.
  • Several trenches returned significant values of zinc and lead, including 6.7% zinc and 1.8% lead over 16 m.
  • Mineralization is hosted by the same laminated limestone unit that hosts the Accha deposit.
  • Two holes were drilled by previous operators, one of which went down a fault with the other returning anomalous zinc values with poor recovery.
  • Located only 3.5 km southwest of the Accha deposit and readily accessible from the main access road to Accha.

Stock Quote
15 minute delay

TSX – ZNC

Investor Relations

Adam Ho
VP, Corporate Development

investorrelations@zincoremetals.com

+1 (604) 669 6611


Could not open XML feed.